Language version

Product Center

contact us

Shengjichuan Industrial Automation Equipment

Mobile phone:13962651551 (Mr. Xiao) 

             15962653322(Mr. Qian)

Website:www.sjcgy.com

Location:No. 12, Taihu South Road, Economic and Technological Development Zone, Kunshan City, Jiangsu Province


Door handle and ground rail robot spraying system

  • Classification: Coating equipment for automotive interior and exterior parts
  • Number of Views:
  • Date of issue: 2021-05-25 18:51:38

Door handle and ground rail robot spraying system

Door handle and ground rail robot spraying system
Detailed introduction

1. Make prenatal planning. The suspension assembly line of the factory must be planned in advance. Before the assembly line, it is necessary to make pre-production planning, identify the quality requirements of customers, and understand the delivery period. Try to understand the key points and difficulties in the entire production process, make pre-natal preparations, and be prepared to fight. Arrangement plan: When the production line is officially launched, the output of the finished product must be planned for the day; for the semi-finished product, the output plan should be a little more than that of the finished product.


2. When arranging the process, we must consider the difficulty of the process, how many products can be made in a day, and how much work needs to be done to meet the requirements of the next process. Let semi-finished products and finished products be produced simultaneously. Semi-finished products cannot be overstocked. When the process of semi-finished products is relatively simple and there are too many processes, it is easy to cause overstock of semi-finished products. Because there are too many semi-finished products, the chance of quality problems will increase when the finished products are produced together, and the quality problems will be difficult to solve after the finished products. If the semi-finished product and the finished product are produced simultaneously, quality problems can be followed up and improved at any time, so as not to cause too much rework.


3. Arrangement of finished product process. In fact, the finished product does not mean that the task is completed, because after the finished product comes out, it must be checked by the inspector to check the goods. So after the finished product comes out on the same day, don't backlog, and send it to the inspector for inspection in time. The handling of rework. The instructor and the inspector should communicate frequently, find out the quality problems found in each process and solve them one by one, and never allow a problem to continue. Otherwise, the assembly line will be messed up and will not flow smoothly.


4. Follow up the mantissa. When the semi-finished products and finished products are off the line, all relevant information must be collected, and one item must be completed and one item must not be delayed. Otherwise, it is easy to affect the delivery date and the production plan of the next product. In general, to ensure that the factory assembly line is unimpeded, the key is to ensure that each process cannot be backlogged. From the upper assembly line to the packaging, no matter which process is like a relay race, it must be completed one by one.


Related labels:

Recent browsing:

Related products:

Related news:

Copyright © 2020 Kunshan shengjichuan industrial automation equipmeAll Rights Reserved. Su ICP no.17003551
Technical support Xiangyun platform
Copyright © Kunshan shengjichuan industrial automation equipme All rights reserved Record No Su ICP no.17003551
二维码

Scan QR code

share