Language version

Your current location: HOME - Products >> Surrounding supporting projects

Product Center

contact us

Shengjichuan Industrial Automation Equipment

Mobile phone:13962651551 (Mr. Xiao) 

             15962653322(Mr. Qian)

Website:www.sjcgy.com

Location:No. 12, Taihu South Road, Economic and Technological Development Zone, Kunshan City, Jiangsu Province


Automatic sewage treatment station

  • Classification: Surrounding supporting projects
  • Number of Views:
  • Date of issue: 2021-05-25 18:58:29

Automatic sewage treatment station

Automatic sewage treatment station
Detailed introduction

Before applying the integrated sewage treatment equipment, it is necessary to check whether all the household appliances in the machine equipment system software are normal, whether the centrifugal fan automobile oil complies with the regulations, until it is fully qualified. Comprehensive sewage treatment equipment must develop a complete set of timely maintenance rules and regulations, and the centrifugal fan cannot be reversed. Maintain the oil of the centrifugal fan regularly and clean the air inlet of the centrifugal fan frequently. Let us briefly introduce the actual operation of the integrated sewage treatment equipment sedimentation tank:


1. The scum is skimmed from the sedimentation tank of the integrated sewage treatment equipment, and the scum is removed with a water seepage spoon. Be careful not to throw it into the water, collect and dispose of it professionally.


2. The sedimentation tank is cleaned, and the outlet weir of the primary sedimentation tank should be cleaned with tap water on time. The waste hanging on the tooth weir should be eliminated immediately, and the aisles and guardrails should also be cleaned.


3. The paint maintenance of the sedimentation tank parts of the integrated sewage treatment equipment, the mud valve, the water inlet valve and other steel parts are easy to rust, so frequent paint maintenance is required.


4. The effect of the sedimentation tank is the weir plate, and the weir plate should be maintained at a level. However, after many years of application, due to factors such as uneven foundation settlement, the weir plate often becomes skewed, and some weir mouths have too much water output, and some have too little water output. Even if there is no water output, at this time, the normal weir should be used to make it level.


5. Integrated sewage treatment equipment sedimentation tank sludge discharge, sludge discharge is the key actual operation in the sedimentation tank management method. The two key points of the actual sludge discharge operation are to grasp the sludge discharge time interval and grasp the delay time of each sludge discharge. If the time interval is too long, the sludge will accumulate and continue to ferment and float; if the delay time is too long, the water content of the sludge will be reduced and the burden of the industrial wastewater treatment building will be increased. The time interval for sludge discharge is longer in winter and shorter in summer.





Related labels:

Recent browsing:

Related products:

Related news:

Copyright © 2020 Kunshan shengjichuan industrial automation equipmeAll Rights Reserved. Su ICP no.17003551
Technical support Xiangyun platform
Copyright © Kunshan shengjichuan industrial automation equipme All rights reserved Record No Su ICP no.17003551
二维码

Scan QR code

share