Language version

Your current location: HOME - Products >> Powder spray coating equipment

Product Center

contact us

Shengjichuan Industrial Automation Equipment

Mobile phone:13962651551 (Mr. Xiao) 

             15962653322(Mr. Qian)

Website:www.sjcgy.com

Location:No. 12, Taihu South Road, Economic and Technological Development Zone, Kunshan City, Jiangsu Province


Powder spraying line for heavy industrial parts of construction machinery

  • Classification: Powder spray coating equipment
  • Number of Views:
  • Date of issue: 2021-05-25 19:07:52

Powder spraying line for heavy industrial parts of construction machinery

Powder spraying line for heavy industrial parts of construction machinery
Detailed introduction

The coating production line of the whole machine was designed with the leading domestic technology at the time, and the mechanization and automation level of the coating production line was improved to improve the working environment and reduce the labor intensity of the workers. At the same time, it also carefully implemented the relevant national regulations. Laws, norms and norms, try our best to do a good job in environmental protection and operational safety and sanitation.


The entire production line consists of 7 stations including on-line, drying, shielding, painting, leveling, drying, and off-line. In addition to the on-line and off-line, the 5 stations are composed of an integrated water trace drying room, The shielding room, the water jet spraying room, the leveling room and the drying room form a closed production line, which is separated from the workshop to ensure the relative cleanliness of the entire paint work area. In addition, a complete machine cleaning section is built at one end of the workshop to perform secondary cleaning of the complete machine. The transportation of the whole machine adopts double-plate ground-on-chain transportation, which improves the level of mechanization.


Regarding the modern coating equipment line, it can generally meet the needs of constant temperature, constant humidity and clean air (air dust content <10mg/m3); however, it is difficult to ensure constant temperature and constant humidity for the comparatively simple coating production line With clean air, the painted workpieces cannot reach the satisfactory coating effect, and it is easy to cause the paint film to produce pin (shrink) holes, orange peel, particles and other paint film defects. In order to prevent the occurrence of pinholes and orange peels in the paint film, the temperature and humidity in the spraying room should be improved at the beginning, so that the temperature and humidity in the spraying room can meet the technical requirements; secondly, the viscosity and thinner of the construction paint should be adjusted according to the different temperature and humidity. In general, the temperature of the spraying room must be controlled below 35℃ and the humidity must be controlled below 80% during spray painting.


Related labels:

Recent browsing:

Related products:

Related news:

Copyright © 2020 Kunshan shengjichuan industrial automation equipmeAll Rights Reserved. Su ICP no.17003551
Technical support Xiangyun platform
Copyright © Kunshan shengjichuan industrial automation equipme All rights reserved Record No Su ICP no.17003551
二维码

Scan QR code

share